Thermoplastic protection Factory assembly of thermoplastic concrete protection plates PP and PE with anchors to building geometry. Assembly on local shell in co-operation with concrete construction. Welding of joints after casing. Intergration of wall openings.
GFK building coating Laminating of glass fibre reinforced polyester resin coating onto a dry building surface treated with bonding primer. Chemical protection by sealing of the laminate surface. Integration of existing building openings.